After more than 240 kms with heavy rain in the morning, climbing from 600 to 2000m to the Klausen pass and 3 flat tires, the day team (Mike / Craig / Jie / Lars / Aaron W / Ihab / Eric / Stefanus / Barbara / Cristianne / Satochi / David R / Frank) arrived at Brienz at 18h40 with everybody tired but in good physical condition. It is more than 2 hours behind schedule but we still have enough buffer to reach Geneva following the initial plan.
Very special note for David Robertson who cycled 240kms! When I am 47y old I would love (dream!) to be able to achieve such performance!
The "night riders" (Bernard / Nanang / Raphael / Carolina / Luis / Nicolas B / Omar / Ken / Jodok / Cristianne / Mike / Craig) took over and are expected to arrive in Pully tommorow between 5 and 6.30 AM. They will cycle through the night and handle the cold weather, fatigue and difficult orientation to make our challenge a reality for our project : Hands on Argentina (HOA).
Team 6 (Cristianne / Mike / Craig / Nanang) cycled all the way until Interlaken.
Team 7 (Omar / Luis / Carolina / Jodok) are currently making their way to reach Thun.
The condition are good and the road is relatively flat (from 300-900m max).
We wish them a safe trip until Pully and address a huge BRAVO to all the MBA 2006 athletes!
SK, live from the front for HOA
PS : I am sure that an encouraging call would be appreciated by our courageous classmates so do not hesitate to send an sms or make a quick call! tx
Saturday, September 30, 2006
Subscribe to:
Post Comments (Atom)
0 Kommentare:
Post a Comment